Anti-Termite Treatment

Pre-construction: Treatments are carried out in 3 stages of construction starting from piling to concreting. This ensures complete protection from termite attacks.

In post – construction treatment we make holes 30cm deep & 12 mm diameter( or ) sometimes making holes with crow-bar 4cm diameter at 15 cm intervals along both side of the walls and the entire area filled with soil for facilitating saturation of the soil with the chemical.

External perimeter treatment: The soil in contact with the external wall of the building must be treated with a chemical solution to the depth & width of 30 cm.

Treated soil barriers shall not be disturbed. Please note that the treated soil must not be removed or deposit with other soil which are not treated on the treated soil.